12×20 Garage & Carport Concrete Slab Calculator

A 12×20 foot footprint (240 sq ft) is the standard single-vehicle garage, carport, or RV/boat parking pad. Because it carries 4,500–7,000 lb rolling axle loads, this preset specifies 5-inch concrete thickness and #4 rebar at 16″ on-center.

Ready-Mix Volume
4.07 yd³ (order 4.25 yd³)
Slab Thickness
5″ Structural Vehicle Spec
#4 Rebar (20′ Sticks)
18 sticks @ 16″ OC
Short-Load Fee?
Usually Waived (≥ 4 yd³)
Rebar Grid, Gravel Base, Waste & Ready-Mix Rate (#4 @ 16″ OC · 4″ base · 10% waste)
Concrete Slab Blueprint — 20′ × 12′ × 5″
PLAN + SECTION · 240 SQ FT
TOP PLAN VIEW (PROPORTIONAL)CROSS-SECTION DETAIL20′-0″12′-0″Form Perimeter: 64 ft · Rebar: 9×15 @ 16″ OCCONCRETE SLAB (5″)#4 Rebar on Chairs#57 GRAVEL BASE (4″)COMPACTED SUBGRADE— 6-Mil Poly Vapor Barrier
80 lb Bags Needed184 bags14,720 lbs dry weight
Ready-Mix Volume4.07 yd³110 cu ft (incl. 10% waste)
#4 Rebar (20′ Sticks)19 sticks348 lin ft @ 16″ OC
Bag vs. Truck CallOrder TruckBags ~$1,242 vs Truck ~$744
Cross-check: 184× 80lb bags | 245× 60lb bags | 367× 40lb bags. Short-load ready-mix estimate assumes $165 fee under 4 yd³.
BREAK-EVEN CHECK

Ready-Mix Truck Recommended (4.07 yd³)

Bagging 184× 80 lb bags means hauling and mixing 14,720 lbs (~$1,242 in bags). A ready-mix truck for this pour runs roughly $744 (including a $165 short-load fee if under 4 yd³).

Hardware-Store Shopping List

Edit local store prices below to calculate your exact project budget.

PickMaterial & SpecQtyEst. Unit ($)Subtotal
80 lb High-Strength Concrete Mix Bags

Concrete · Yields 0.6 cu ft/bag (4.07 yd³ incl. 10% waste)

Total dry weight: 14,720 lbs

184 bags
$6.75
$1,242.00
2×6 × 8 ft Form Lumber

Formwork · 64 linear ft perimeter + 10% cut allowance

9 boards
$6.85
$61.65
18″ Wood or Steel Concrete Form Stakes

Formwork · Spaced every 4 ft + corners

20 stakes
$1.75
$35.00
#4 (1/2″) Rebar — 20 ft Sticks

Reinforcement · 9×15 grid @ 16″ OC (348 lin ft)

19 sticks
$14.50
$275.50
Rebar Support Chairs & Tie Wire Pack

Reinforcement · 1 chair per ~4 sq ft (60 pcs)

5 packs
$18.00
$90.00
#57 Crushed Stone / Compactable Base Gravel

Sub-Base · 4″ depth (4.56 tons @ 1.4 tons/yd³)

3.5 cu yd
$52.00
$182.00
6-Mil Poly Vapor Barrier / Curing Sheeting (10×25 ft)

Prep & Finish · Covers 240 sq ft slab footprint

2 rolls
$24.00
$48.00
Estimated Materials Subtotal (Excl. Tax & Tools)$1,934.15
Default unit prices reflect typical US big-box averages. Verify local lumber/aggregate quotes before ordering.BuildSpec Studio · https://buildspecstudio.com
Size-Specific Engineering Notes

Key Construction Tips for This 12×20 Single-Car Slab (5″) Project

  • Crossing the 4.0 cubic yard threshold eliminates short-load delivery penalties at most US ready-mix batch plants, significantly reducing your cost per cubic yard.
  • Specify 4,000 PSI air-entrained concrete (5%–7% air entrainment) if your region sees winter freeze-thaw cycles and road salt tracked in by vehicles.
  • Slope garage slabs 1/8″ per foot (2.5 inches over 20 feet) toward the overhead door apron so snowmelt and wash water drain outward instead of pooling against rear drywall.

Estimated DIY Budget & Labor

Ready-mix concrete (~$750–$900 for 4.25 yd³) plus 2×6 formwork, rebar grid, and 4.6 tons of #57 gravel base puts DIY materials around $1,450–$1,850.

Quick Answers for 12×20 Single-Car Slab (5″)

How many yards of concrete for a 12×20 slab?

At 4 inches thick, a 12×20 slab needs 3.26 yd³ (incl. 10% waste). At heavy vehicle-duty 5 inches thick, it requires 4.07 yd³—order 4.25 cubic yards from the batch plant.

Do I need 2×4 or 2×6 boards to form a 5-inch slab?

Always use 2×6 lumber (5.5″ actual height) for 5-inch or 6-inch pours. Standard 2×4s only measure 3.5″ tall and will be too short to hold concrete grade.

Engineering Methodology

How Concrete Slab Volume, Bag Yield & Rebar Math Work

Estimating a residential concrete pad accurately requires more than multiplying length by width by depth. Real-world excavation bottoms are never laser-flat: slight depressions of even half an inch across a 12×20 ft garage pad can swallow an extra 10 cubic feet of concrete—roughly 17 additional 80 lb bags. That is why every structural concrete estimate starts with net geometric volume and adds a 5% to 10% waste and subgrade-variation allowance.

In the United States, bagged concrete mix is sold by weight (40 lb, 60 lb, and 80 lb bags) while ready-mix concrete trucks sell by the cubic yard (27 cubic feet). Per Quikrete and Sakrete published yield specifications, an 80 lb bag of standard 4,000 PSI concrete yields exactly 0.60 cubic feet when mixed with water; a 60 lb bag yields 0.45 cubic feet; and a 40 lb bag yields 0.30 cubic feet. Thus, one full cubic yard requires 45 bags of 80 lb mix—3,600 pounds of dry concrete before water.

Beneath the concrete itself, a compacted 4-inch layer of angular #57 crushed stone or road base provides uniform bearing support and breaks capillary groundwater rise, while a 6-mil polyethylene vapor barrier prevents slab moisture from wicking into sheds or workshops. For crack control and tensile load distribution, #4 (1/2-inch) deformed steel rebar tied on 16-inch or 18-inch centers and elevated on rebar chairs into the middle third of the slab dramatically outperforms flat wire mesh that gets trampled to the bottom during the pour.

Formulas Used in This Blueprint

Net Slab Volume (cu ft)

V_ft³ = Length(ft) × Width(ft) × (Thickness(in) ÷ 12)

Converts inch thickness into feet before multiplying by footprint area.

Cubic Yards with Waste

V_yd³ = (V_ft³ × (1 + Waste% ÷ 100)) ÷ 27

There are exactly 27 cubic feet in 1 cubic yard (3 ft × 3 ft × 3 ft).

80 lb Concrete Bags

Bags_80 = ceil(Gross_ft³ ÷ 0.60)

Use 0.45 cu ft for 60 lb bags and 0.30 cu ft for 40 lb bags.

Rebar Grid Count

Bars = floor((Span(in) − 6″ cover) ÷ Spacing(in)) + 1

Maintains 3 inches of concrete cover on both edges so moisture cannot reach steel.

Worked Real-World Examples

Example 1: 10×10 ft Shed Pad (4″ Thick, 10% Waste)

A homeowner pouring a backyard shed pad wants to decide between hauling 80 lb bags or hiring a short-load ready-mix truck.

  1. Footprint area = 10 ft × 10 ft = 100 sq ft.
  2. Net volume = 100 × (4 ÷ 12) = 33.33 cu ft (1.23 yd³).
  3. Add 10% over-dig and spill buffer: 33.33 × 1.10 = 36.67 cu ft (1.36 yd³).
  4. 80 lb bags needed = ceil(36.67 ÷ 0.60) = 62 bags (4,960 lbs dry weight).
  5. Rebar (#4 @ 16″ OC with 3″ edge clearance): 8 bars each direction × 9.5 ft = 152 linear ft → 8× 20 ft rebar sticks.

Pro Takeaway: At 62 bags (~$418) vs. a 1.5 yd³ ready-mix delivery (~$428 with short-load fee), ordering a concrete truck costs almost the exact same amount while eliminating 2.5 tons of back-breaking mixing.

Example 2: 20×20 ft Two-Car Garage Slab (5″ Thick, 16″ OC Rebar)

A detached workshop slab rated for pickup trucks and a two-post lift needs thicker 5-inch concrete and tight rebar spacing.

  1. Footprint area = 20 ft × 20 ft = 400 sq ft.
  2. Net volume = 400 × (5 ÷ 12) = 166.67 cu ft (6.17 yd³).
  3. Add 10% buffer: 6.17 × 1.10 = 6.79 yd³ (order 7.0 yd³ from batch plant).
  4. Gravel sub-base (4″ compacted #57 stone + 10%): 5.43 yd³ ≈ 7.6 tons.

Pro Takeaway: Never bag-mix a pour over 2 cubic yards—cold joints form between hand-mixed batches before you can finish the slab, weakening the concrete permanently.

Quick Reference: Common US Concrete Slab Sizes (4″ Thick, 10% Waste Included)

Slab SizeArea (sq ft)Volume (yd³)80 lb Bags60 lb BagsRecommended Method
6 × 8 ft (AC / Generator Pad) 48 0.65 yd³ 30 bags 40 bags Bag mix (rent drum mixer)
8 × 10 ft (Small Patio) 80 1.09 yd³ 49 bags 66 bags Bag mix or trailer-buggy
10 × 10 ft (Shed Pad) 100 1.36 yd³ 62 bags 82 bags Borderline — ready-mix saves labor
12 × 16 ft (Large Patio) 192 2.61 yd³ 118 bags 157 bags Ready-mix delivery truck
12 × 20 ft (1-Car Garage) 240 3.26 yd³ 147 bags 196 bags Ready-mix delivery truck
20 × 20 ft (2-Car Garage) 400 5.43 yd³ 245 bags 326 bags Ready-mix (no short-load fee)

Common DIY Mistakes to Avoid

  • Ordering exact geometric volume with 0% waste—running 3 bags short mid-pour forces a panicked hardware-store run while your slab is already setting.
  • Adding too much mixing water to make concrete easier to screed; excess water drastically cuts 28-day compressive PSI and causes surface dusting and shrinkage cracking.
  • Skipping control joints: cut or tool contraction joints every 8 to 10 feet (roughly 24–30× slab thickness in inches) to at least 1/4 of the slab depth so cracks stay straight and hidden.
  • Letting rebar touch native soil: steel needs at least 3 inches of concrete cover on the bottom and edges or rust will expand and spall the concrete within a few winters.

Frequently Asked Questions

How many 80 lb bags of concrete make 1 cubic yard? +

Exactly 45 bags of 80 lb concrete mix make 1 cubic yard (27 cu ft ÷ 0.60 cu ft per bag = 45). For 60 lb bags you need 60 bags per cubic yard, and for 40 lb bags you need 90 bags.

Should my concrete slab be 4 inches or 6 inches thick? +

A 4-inch slab over 4 inches of compacted gravel is standard for patios, walkways, sheds, and standard passenger-car garages. Step up to 5–6 inches (with #4 rebar @ 12″–16″ OC and thickened 8–12″ perimeter edges) for heavy pickup trucks, RV pads, hot tubs, or workshop lifts.

When is ready-mix concrete cheaper than buying bags? +

Ready-mix batch plants usually charge a short-load fee ($125–$200) for orders under 3 to 4 cubic yards. Even with that fee, ready-mix generally breaks even on cost around 1.5 to 2.0 cubic yards (~70–90 eighty-pound bags) and saves an entire day of heavy lifting.

Do I really need gravel underneath a concrete slab? +

Yes, unless you are pouring directly on undisturbed, well-draining sandy gravel soil. A 4-inch compacted bed of angular #57 crushed stone prevents frost heave, stops clay expansion from cracking the pad, and provides an even drainage plane.

How long should a concrete slab cure before building a shed or driving on it? +

You can walk on fresh concrete after 24–48 hours, frame a lightweight shed after 3–5 days, and park passenger vehicles after 7 days. Concrete reaches its rated 4,000 PSI full design strength at 28 days—keep it damp or covered with poly sheeting during the first 7 days for maximum durability.

Engineering & Safety Notice: All quantities, lumber spans, and footing estimates are provided for residential project planning and material budgeting. Always verify local building codes, wind/snow load tables, frost-line depths, and call 811 for utility locates before excavating.